Project 2499 : Jiangxi Pinggang Group 20MW Waste Gas and Surplus Steam based Captive Power Plant
Project title Jiangxi Pinggang Group 20MW Waste Gas and Surplus Steam based Captive Power Plant
- project design document (746 KB)

PDD appendices
Appendix 1 - Enclosure (139 KB)
Appendix 2 - Enclosure 1 (155 KB)
Appendix 3 - Enclosure 2 (868 KB)
Appendix 4 - Enclosure 3 (232 KB)
Appendix 5 - Enclosure 4 (754 KB)
Appendix 6 - Enclosure 5 (128 KB)


- registration request form (297 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (189 KB) authorization (189 KB)
Authorized Participants: Pingxiang Iron and Steel Group Co., Ltd.
Other Parties Involved Japan , involved indirectly approval (341 KB) authorization (341 KB)
Authorized Participants: The Tokyo Electric Power Company, Incorporated
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used ACM0012 ver. 2 - Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
Standardized baselines used N/A
Amount of Reductions 103,368 metric tonnes CO2 equivalent per annum
Fee level USD 19173.6
Validation Report Validation report (2258 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Withdrawn   (view history)  
Crediting Period 01 Jul 09 - 30 Jun 19 (Fixed)