16:54 13 Feb 12
Project
2181 :
Methane Capture and On-site Power Generation Project at Syarikat Cahaya Muda Perak (Oil Mill) Sdn. Bhd. in Tapah, Perak, Malaysia
| Project title |
Methane Capture and On-site Power Generation Project at Syarikat Cahaya Muda Perak (Oil Mill) Sdn. Bhd. in Tapah, Perak, Malaysia
- project design document (803 KB)
PDD appendices Appendix 1 - Enclosure (349 KB)
Appendix 2 - Enclosure 1 (527 KB)
Appendix 3 - Enclosure 2 (84 KB)
Appendix 4 - Enclosure 3 (90 KB)
Appendix 5 - Enclosure 4 (2864 KB)
- revised monitoring plan (226 KB)
(Approved:
07 Sep 10)
- validation report of revised monitoring plan (705 KB)
- registration request form (237 KB)
|
|---|---|
| Host Parties |
Malaysia
, involved indirectly
approval (122 KB)
authorization (122 KB)
Authorized Participants: Syarikat Cahaya Muda Perak (Oil Mill) Sdn. Bhd |
| Other Parties Involved | n/a |
| Sectoral scopes | 13 : Waste handling and disposal |
| Activity Scale | LARGE |
| Methodologies Used |
AM0022 ver. 4 -
Avoided Wastewater and On-site Energy Use Emissions in the Industrial Sector
|
| Amount of Reductions | 67,133 metric tonnes CO2 equivalent per annum |
| Fee level | USD 11926.6 |
| Validation Report |
Validation report (603 KB)
MoC Annex 2 (Withdraw Project Participant) valid as of 12/05/2011 Public availability information Link to information uploaded for public availability |
| Registration Date | 26 Jan 09 (view history) |
| Crediting Period |
01 Jun 09 - 31 May 19
(Fixed)
Changed from: 26 Jan 09 - 25 Jan 19 |
| Requests for Issuance
and related documentation |
Monitoring report: 01 Jun 2009 - 31 Dec 2009 (257 KB)Issuance request state: Issued CERs requested: 14102 Serial Range: Block start: MY-5-961921-1-1-0-2181 Block end: MY-5-976022-1-1-0-2181 [Full view and history] Monitoring report: 01 Jan 2010 - 30 Sep 2010 (979 KB)Issuance request state: Awaiting issuance request [Full view and history] |

project design document
Appendix 1 - Enclosure