Project: 1433 Hubei Xuan’en Dongping Hydropower Station - Crediting Period Renewal Request
[]
Project 1433: Hubei Xuan’en Dongping Hydropower Station

- project design document (588 KB)

PDD appendices
Appendix 1 - Dongping-ER (40 KB)

- crediting period renewal form (111 KB)
Methodologies Used ACM0002 ver. 15 - Grid-connected electricity generation from renewable sources
VVS Version
Standardized baselines used N/A
Amount of Reductions 196,358 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (420 KB)
Renewal Date 10 Dec 14 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 13 Apr 15 - 12 Apr 22

Other crediting period(s): 13 Apr 08 - 12 Apr 15
Requests for Issuance
and related documentation