Project 2507 : Waste Heat Recovery based Captive Power Project of Adhunik Metaliks Limited
Project title Waste Heat Recovery based Captive Power Project of Adhunik Metaliks Limited
- project design document (824 KB)

PDD appendices
Appendix 1 - Adhunik Metaliks Limited - Power Cost (45 KB)
Appendix 2 - CER Spreadsheet (27 KB)
Appendix 3 - Letter from Avant Garde (1002 KB)
Appendix 4 - CDM consideration (586 KB)
Appendix 5 - E-mail communications between PP and CDM Consultant Part 1 (125 KB)
Appendix 6 - E-mail communications between PP and CDM Consultant Part 2 (156 KB)
Appendix 7 - E-mail communications between PP and CDM Consultant Part 3 (77 KB)
Appendix 8 - E-mail communications between PP and CDM Consultant Part 4 (29 KB)
Appendix 9 - Adhunik Steel - Power Costs sensitivity summary (14 KB)
Appendix 10 - Power Cost - Coal Sensitivity (62 KB)
Appendix 11 - Power Cost-Coal and Grid Sensitivity (59 KB)
Appendix 12 - Power Cost-Coal and Grid and Waste Gas Sensitivity-1 (59 KB)
Appendix 13 - Power Cost-Coal and Grid and Waste Gas Sensitivity-2 (59 KB)
Appendix 14 - Power Cost-Coal and WG Sensitivity (62 KB)
Appendix 15 - Power Cost-Grid Sensitivity (59 KB)
Appendix 16 - Power Cost-Grid and Waste Gas Sensitivity (61 KB)
Appendix 17 - Power Cost-Waste Gas Sensitivity (48 KB)


- registration request form (659 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (573 KB) authorization (573 KB)
Authorized Participants: Adhunik Metaliks Ltd
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used ACM0012 ver. 2 - Consolidated baseline methodology for GHG emission reductions for waste gas or waste heat or waste pressure based energy system”
Standardized baselines used N/A
Amount of Reductions 80,065 metric tonnes CO2 equivalent per annum
Fee level USD 14513.0
Validation Report Validation report (726 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)  
Crediting Period 01 Aug 09 - 31 Jul 19 (Fixed)