Project: 2507 Waste Heat Recovery based Captive Power Project of Adhunik Metaliks Limited - History
Project 2507: Waste Heat Recovery based Captive Power Project of Adhunik Metaliks Limited
Request for review Request 1
Request 2
Request 3


EB meeting: EB49
(at which the Board considers the request(s) for review, decides whether to undertake the review and, if so, determine its scope and selects a review team)

Initial comments:
SGS and PP Response to Request for Review (180 KB)
Annex 01- PO for WHRB (307 KB)
Annex 02 - Contract Agreement for TG (477 KB)
Annex 03 - Actual Cost (771 KB)
Annex 04 - Common Rupee Loan Agreement (2149 KB)
Annex 05 - DRI Production data (442 KB)
Annex 06 - Manufacturer Data for DRI kiln (157 KB)
Annex 07- Adhunik Metaliks Limited-Revised CER Spreadsheet (27 KB)
Annex 08 - Directors Report 2006-2007 (172 KB)
Annex 09 - Electricity Bills_2006-2007 (1409 KB)
Annex 10 - Technical Specification of Waste Heat Recovery Boilers (519 KB)
Review Scope (142 KB)

EB meeting: EB50
(at which the report of the review team was/will be considered)