Project 2932 : Tao River Lianlu Cascade II (Xiacheng) 37.5MW Hydropower Project in Gansu Province, China
Project title Tao River Lianlu Cascade II (Xiacheng) 37.5MW Hydropower Project in Gansu Province, China
- project design document (588 KB)

PDD appendices
Appendix 1 - Documents Attached to PDD_Tao River Lianlu Cascade II_clean (3844 KB)
Appendix 2 - Documents Attached to PDD_Tao River Lianlu Cascade II_track (3845 KB)
Appendix 3 - No.12 IRR Spreadsheet_Tao River Lianlu Cascade II (279 KB)
Appendix 4 - No.13-1 IRR of Tao River Lianlu Cascade II_-14year loan repayment (341 KB)
Appendix 5 - No.13-2 IRR of Tao River Lianlu Cascade II_-15year loan repayment (342 KB)


- registration request form (2652 KB)
Host Parties China , involved indirectly approval (130 KB) authorization (130 KB)
Authorized Participants: Gansu Diantou Tao River Hydro Power Development Co., Ltd
Other Parties Involved Japan , involved indirectly approval (189 KB) authorization (189 KB)
Authorized Participants: Sumitomo Corporation ; Sumitomo Joint Electric Power Co., Ltd
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 9 - Consolidated methodology for grid-connected electricity generation from renewable sources
Amount of Reductions 120,590 metric tonnes CO2 equivalent per annum
Fee level USD 22618.0
Validation Report Validation report (1286 KB)

Public availability information
Link to information uploaded for public availability
Registration Date 06 Sep 10   (view history)  
Crediting Period 06 Sep 10 - 05 Sep 17 (Renewable)
Requests for Issuance
and related documentation

Monitoring report: 06 Sep 2010 - 29 Aug 2011 (381 KB)
Issuance request state: Awaiting issuance request
[Full view and history]