Project 4226 : Utilisation of the thermal energy content of the waste gas of clinker cooler and pre-heater for power generation at a cement plant in Rajasthan
Project title Utilisation of the thermal energy content of the waste gas of clinker cooler and pre-heater for power generation at a cement plant in Rajasthan
- project design document (700 KB)

PDD appendices
Appendix 1 - 4226 Baseline Cal (29 KB)
Appendix 2 - 4226 ER Sheet (35 KB)
Appendix 3 - 4226 Elecricity Consumption (35 KB)
Appendix 4 - 4226 Financial Cal (118 KB)


- registration request form (191 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (344 KB) authorization (344 KB)
Authorized Participants: Birla Corporation Limited
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used AM0024 ver. 2 - Baseline methodology for greenhouse gas reductions through waste heat recovery and utilization for power generation at cement plants
Standardized baselines used N/A
Amount of Reductions 40,026 metric tonnes CO2 equivalent per annum
Fee level USD 6505.2
Validation Report Validation report (2351 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)  
Crediting Period 01 Apr 11 - 31 Mar 21 (Fixed)