Project 1901 : Electricity grid interconnection San Gabán – Mazuko – Puerto Maldonado
Project title Electricity grid interconnection San Gabán – Mazuko – Puerto Maldonado
- project design document (589 KB)

PDD appendices
Appendix 1 - investment analysis (9059 KB)
Appendix 2 - ER (209 KB)
Appendix 3 - EF (6130 KB)
Appendix 4 - Estudios bono (552 KB)


- registration request form (482 KB)
Host Parties Peru , involved indirectly approval (612 KB) authorization (612 KB)
Authorized Participants: Electro Sureste S.A.A.
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 6 - Consolidated methodology for grid-connected electricity generation from renewable sources
AM0045 - Grid connection of isolated electricity systems
Amount of Reductions 17,819 metric tonnes CO2 equivalent per annum
Fee level USD 2063.8
Validation Report Validation report (1032 KB)

Public availability information
Link to information uploaded for public availability
Registration Date Rejected   (view history)  
Crediting Period 01 Sep 08 - 31 Aug 15 (Renewable)