Project 1475 : Optimization of steam consumption in the process by installation of free flow falling film finisher evaporator and retrofit to the chemical recovery boiler in Cachar Paper Mill of Hindustan Paper Corporation Limited
Project title Optimization of steam consumption in the process by installation of free flow falling film finisher evaporator and retrofit to the chemical recovery boiler in Cachar Paper Mill of Hindustan Paper Corporation Limited
- project design document (572 KB)

PDD appendices
Appendix 1 - CDM consideration (160 KB)
Appendix 2 - doc1 (1670 KB)
Appendix 3 - ER (169 KB)
Appendix 4 - Silica contant (64 KB)


- registration request form (157 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties India , involved indirectly approval (904 KB) authorization (904 KB)
Authorized Participants: Hindustan Paper Corporation Limited, Unit - Cachar Paper Mill
Other Parties Involved n/a
Sectoral scopes 3 : Energy demand
4 : Manufacturing industries
Activity Scale SMALL
Methodologies Used AMS-II.D. ver. 9 - Energy efficiency and fuel switching measures for industrial facilities
Standardized baselines used N/A
Amount of Reductions 25,664 metric tonnes CO2 equivalent per annum
Fee level USD 3632.8
Validation Report Validation report (338 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)  
Crediting Period 31 Mar 08 - 31 Jan 18 (Fixed)