Project: 1190 Pingwu Renjiaba 12.6 MW Small Hydropower Project, P.R.China - Issuance Request
Project 1190: Pingwu Renjiaba 12.6 MW Small Hydropower Project, P.R.China
 
ISSUANCE STATUS Issued (on 03 Feb 11)  
Monitoring period 21 Aug 09 - 20 Jul 10
Monitoring report Monitoring report (129 KB)
 
Request for issuance Signed form (1731 KB)
Amount of CERs 62,278
Serial Range: Block start: CN-5-300268137-1-1-0-1190     Block end: CN-5-300330414-1-1-0-1190
Verification and certification reports Certification report (65 KB)
Verification report (760 KB)
Additional documents Renjiaba 3 Monitoring Report (129 KB)
Renjiaba 3 Emission Reductions Calculation (55 KB)