Project: 1190 Pingwu Renjiaba 12.6 MW Small Hydropower Project, P.R.China - Issuance Request
Project 1190: Pingwu Renjiaba 12.6 MW Small Hydropower Project, P.R.China
 
ISSUANCE STATUS Issued (on 12 Dec 08)  
Monitoring period 17 Sep 07 - 20 Aug 08
Monitoring report Monitoring report (68 KB)
 
Request for issuance Signed form (484 KB)
Amount of CERs 50,302
Serial Range: Block start: CN-5-95294871-1-1-0-1190     Block end: CN-5-95345172-1-1-0-1190
Verification and certification reports Certification report (58 KB)
Verification report (215 KB)
Additional documents Pingwu Renjiaba MR (51 KB)
Pingwu Renjiaba ER Calculation (20 KB)