Project 0835 : Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project
Project title Switching of fuel from Low Sulphur Waxy Residue fuel oil to natural gas at Gangnam branch Korea District Heating Corporation Project
- project design document (801 KB) (accepted - 20 May 2011 - view previous)

PDD appendices
Appendix 1 - PDD with track changes (857 KB)
Appendix 2 - Enclosure (36 KB)
Appendix 3 - Enclosure 1 (98 KB)
Appendix 4 - Enclosure 2 (105 KB)
Appendix 5 - Enclosure 3 (100 KB)
Appendix 6 - Enclosure 4 (311 KB)
Appendix 7 - Enclosure 5 (309 KB)
Appendix 8 - Enclosure 6 (211 KB)
Appendix 9 - Enclosure 7 (49 KB)
Appendix 10 - Enclosure 8 (179 KB)


- registration request form (132 KB)
Host Parties Republic of Korea , involved indirectly approval (97 KB) authorization (97 KB)
Authorized Participants: Korea District Heating Corporation
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used ACM0009 ver. 3 - Consolidated baseline and monitoring methodology for fuel switching from coal or petroleum fuel to natural gas
Amount of Reductions 34,703 metric tonnes CO2 equivalent per annum
Fee level USD 5440.6
Validation Report Validation report (1223 KB)
Modalities of Communication valid as of 11/04/2011
Public availability information
Link to information uploaded for public availability

Validation opinion on changes in PDD (1547 KB)
Registration Date 02 Apr 07   (view history)  
Crediting Period 01 Apr 08 - 31 Mar 18 (Fixed)
Changed from: 01 Jan 08 - 31 Dec 17
Requests for Issuance
and related documentation

Monitoring report: 01 Apr 2008 - 31 Mar 2009 (427 KB)
Issuance request state: Awaiting issuance request
[Full view and history]



Monitoring report: 01 Apr 2009 - 31 Oct 2011 (1074 KB)
Issuance request state: Awaiting issuance request
[Full view and history]