Project 3115 : 17.6 MW captive grid connected electricity generation from wind energy project by Chennai Petroleum Corporation Limited.
Project title 17.6 MW captive grid connected electricity generation from wind energy project by Chennai Petroleum Corporation Limited.
- project design document (767 KB)

PDD appendices
Appendix 1 - Benchmark at time of investment decision CPCL_13.08.2009 (69 KB)
Appendix 2 - Benchmark calculation for CPCL MW TN wind farm_10.12.2008 (66 KB)
Appendix 3 - CER calculations 13.08.2008 (25 KB)
Appendix 4 - CPCL_wind farm board resolution (219 KB)
Appendix 5 - 1. CPCL financial analysis at time of investment _ 17 MW_27.08.2009 (219 KB)
Appendix 6 - 2. CPCL financial analysis at time of investment _ 17.6 MW_27.08.2009 (220 KB)
Appendix 7 - 3. CPCL financial analysis Purchase Order_27.08.2009 (217 KB)
Appendix 8 - 4. CPCL financial analysis at time of investment _ 17.6 MW_27.08.2009_sale to EB (215 KB)


- registration request form (93 KB)
Host Parties India , involved indirectly approval (562 KB) authorization (562 KB)
Authorized Participants: Chennai Petroleum Corporation Limited
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 10 - Consolidated methodology for grid-connected electricity generation from renewable sources
Amount of Reductions 34,186 metric tonnes CO2 equivalent per annum
Fee level USD 5337.2
Validation Report Validation report (593 KB)

Public availability information
Link to information uploaded for public availability
Registration Date 06 May 10   (view history)  
Crediting Period 06 May 10 - 05 May 20 (Fixed)
Requests for Issuance
and related documentation