Project 2909 : Sichuan Heishui Zhawo No.1 Hydropower Project
Project title Sichuan Heishui Zhawo No.1 Hydropower Project
- project design document (483 KB)

PDD appendices
Appendix 1 - Appendix CDM consideration (841 KB)
Appendix 2 - Appendix IRR (303 KB)


- registration request form (193 KB)
Host Parties China , involved indirectly approval (135 KB) authorization (135 KB)
Authorized Participants: Heishui Sanlian Hydropower Development Co., Ltd.
Other Parties Involved Netherlands , involved indirectly approval (99 KB) authorization (99 KB)
Authorized Participants: Rabobank International
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale SMALL
Methodologies Used AMS-I.D. ver. 13 - Grid connected renewable electricity generation
Amount of Reductions 28,968 metric tonnes CO2 equivalent per annum
Fee level USD 4293.6
Validation Report Validation report (343 KB)

Public availability information
Link to information uploaded for public availability
Registration Date Rejected   (view history)  
Crediting Period 01 Dec 09 - 30 Nov 16 (Renewable)