Project 7384 : UCC RAK Waste Heat Recovery
Project title UCC RAK Waste Heat Recovery
- project design document (1063 KB)

PDD appendices
Appendix 1 - ER_Calculation_UCC_RAK_WasteHeatRecovery_14092012 (207 KB)
Appendix 2 - GEF FEWA RasAlKhaimah Calculation-V3 (127 KB)
Appendix 3 - OM EF of the ADWEA grid-V2 (46 KB)


- registration request form (790 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties United Arab Emirates , involved indirectly approval (40 KB) authorization (40 KB)
Authorized Participants: Union Cement Company (P.S.C.) (UCC) ; Dubai Carbon Centre of Excellence
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
4 : Manufacturing industries
Activity Scale LARGE
Methodologies Used ACM0012 ver. 4 - Consolidated baseline methodology for GHG emission reductions from waste energy recovery projects
Standardized baselines used N/A
Amount of Reductions 59,361 metric tonnes CO2 equivalent per annum
Fee level USD 10372.2 (deferred)
Validation Report VVS/VVM version: VVM 1.2
Validation report (1521 KB)
MoC Annex 1
Modalities of Communication valid as of 14/01/2013
Public availability information
Link to information uploaded for public availability
Registration Date 21 Sep 12 (Date of registration action 19 Dec 12)   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 01 Oct 12 - 30 Sep 22 (Fixed)
Requests for Issuance
and related documentation