Home   CDM   JI   CC:iNet   TT:Clear  RSS | CDM GLOSSARY | FAQ | CONTACT US | DISCLAIMER | My CDM / LOGIN | JOIN

  23:37 20 Mar 10

Meth Panel
 
Methodologies Panel
The Methodologies Panel (Meth Panel) was established to develop recommendations to the Executive Board on guidelines for methodologies for baselines and monitoring plans and prepare recommendations on submitted proposals for new baseline and monitoring methodologies.

Work programme of the Meth Panel for the first semester of 2010 (172 KB)
Revised terms of reference for the Methodologies Panel (version 06) (160 KB)
General Guidelines for panels/working groups (143 KB)

Chair: Mr. Lex de Jonge           Vice-Chair: Mr. Phillip Gwage

Please note that baseline and monitoring methodologies can be submitted at any time. The deadlines mentioned below reflect only the cut-off date for the submissions to be considered at the respective Meth Panel meeting.

For Meth Panel recommendations on proposed new methodologies, please visit the Methodologies section of the site.
For Meth Panel clarifications on approved methodologies, please visit the corresponding section of the site.
For Meth Panel revisions on approved methodologies, please visit the corresponding section of the site.

Meth Panel Meeting :   045 Date :   21 - 25 June 2010 Deadline for submission of new methodologies : 26 April 2010
Agenda Resulting documents will be available after the meeting

Meth Panel Meeting :   044 Date :   19 - 23 April 2010 Deadline for submission of new methodologies : 28 December 2009 and 01 March 2010
Agenda Resulting documents will be available after the meeting

Meth Panel Meeting :   043 Date :   22 - 26 February 2010 No deadline connected
Agenda (102 KB) Meeting Report (146 KB)
Annex 1 - Draft baseline and monitoring methodology based on NM0280 “Installation of energy free water purifier for safe drinking water application” (336 KB)
Annex 2 - Draft consolidated baseline and monitoring methodology for construction of a new natural gas power plant supplying electricity to the grid or a single consumer (319 KB)
Annex 3 - Draft revision to ACM0013 “Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology” (303 KB)
Annex 4 - Draft revision to ACM0015 “Consolidated baseline and monitoring methodology for project activities using alternative raw materials that do not contain carbonates for clinker production in cement kilns” (515 KB)
Annex 5 - Draft revision to AM0070 “Manufacturing of energy efficient domestic refrigerators” (387 KB)
Annex 6 - Draft revision to AM0071 “Manufacturing and servicing of domestic refrigeration appliances using a low GWP refrigerant” (396 KB)
Annex 7 - Draft revision to “Tool to calculate the emission factor for an electricity system” (447 KB)
Annex 8 - Draft “Tool to calculate the weighted average cost of capital (WACC)” (209 KB)

Meth Panel Meeting :   042 Date :   18 - 22 January 2010 Deadline for submission of new methodologies : 26 October 2009
Agenda (123 KB) Meeting Report (282 KB)
Annex 1 - Draft revision to AM0028 (818 KB)
Annex 2 - Draft revision to AM0034 (313 KB)
Annex 3 - Draft revision to AM0048 (404 KB)
Annex 4 - Draft revision to ACM0002 (308 KB)
Annex 5 - Draft revision to ACM0006 (742 KB)
Annex 6 - Draft reformatted consolidated baseline and monitoring methodology for electricity generation from biomass residues in power-only plants (571 KB)

Meth Panel Meeting Archive Year
41 | 40 | 39 | 38 | 37 | 36 | 2009
35 | 34 | 33 | 32 | 31 | 30 | 29 | 28 | 27 | 26 | 25 | 24 | 23 | 22 | 21 | 20 | 19 2008 - 2007 - 2006
18 | 17 | 16 | 15 | 14 | 13 | 12 | 11 | 10 | 09 | 08 | 07 | 06 | 05 | 04 | 03 | 02 | 01 2005 - 2004 - 2003 - 2002

* In accordance with the " Procedures for submission and consideration of a proposed new methodology " agreed by the Executive Board, at its eighth meeting and revised at its ninth meeting, a proposed new methodology shall be available to the Meth Panel at least seven weeks prior to its next meeting.