Project: 2475 LG Chem Naju plant fuel switching project - Request for post-registration changes
Project 2475 LG Chem Naju plant fuel switching project
PRC ref PRC-2475-001
Process track Prior approval
DOE KSA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 04 Jun 09 - 03 Jun 19
Assessment opinion Assessment opinion (705 KB)
Revised PDD Revised PDD (726 KB)   Revised PDD - track changes (767 KB)
Supplementary documents Appendix 1 - 2475_0-1. Appendix A_VVS Checklist for PA _ PRC _ 30092017.pdf (245 KB)
Appendix 2 - PRC_Emission Reduction Sheet_Revised_Aug. 2017.xlsx (65 KB)
Appendix 3 - 2475_3. PRC_NPV analysis_Revised_30092017.xlsx (40 KB)
Signed form Signed form (80 KB)
DOE clarification DOE clarification 1 - 2475_LG Chemical(Ref. 2475) Validation report form for PRC _ Ver.1.3 _ 27 Oct 2017.pdf (654 KB)
VVS version VVS-PA 1.0
Current status 05 Mar 18 - Rejected
Effective rejection date: 01 Mar 18. Reason (171 KB)
Historic statuses 02 Oct 17 - Published
16 Oct 17 - Awaiting DOE clarifications
30 Oct 17 - DOE clarifications received
30 Oct 17 - Summary note being prepared
23 Nov 17 - Request added to EB98 meeting agenda