Project: 4217 Bujagali Hydropower Project - Request for post-registration changes
Project 4217 Bujagali Hydropower Project
PRC ref PRC-4217-002
Process track Issuance
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 01 Dec 11 - 30 Nov 18
Assessment opinion Assessment opinion (472 KB)
Revised PDD Revised PDD (1524 KB)   Revised PDD - track changes (1262 KB)
Supplementary documents
Signed form Signed form (145 KB)
DOE clarification
VVS version VVS 2.0
Current status 31 May 18 - Approved
Effective approval date: 31 May 18
Historic statuses 02 May 18 - Request published