Project: 1254 The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi - Request for post-registration changes
Project 1254 The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi
PRC ref PRC-1254-003
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 10 Mar 2015 - 09 Mar 2017

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 30 Mar 11 - 29 Mar 21
Assessment opinion Assessment opinion (155 KB)
Revised PDD Revised PDD (748 KB)   Revised PDD - track changes (925 KB)
Supplementary documents Appendix 1 - UN 1254_ER Calculation Sheet.xls (1336 KB)
Appendix 2 - UN 1254_ER Calculation Sheet_Average.xls (1344 KB)
Appendix 3 - UN 1254_ER Calculation Sheet_Minimum.xls (1341 KB)
Signed form Signed form (121 KB)
DOE clarification DOE clarification 1 - Clarification Response.pdf (17 KB)
VVS version VVS 9.0
Current status 31 Jul 17 - Rejected
Effective rejection date: 27 Jul 17. Reason (106 KB)
Historic statuses 29 May 17 - Published
12 Jun 17 - Awaiting DOE clarifications
21 Jun 17 - DOE clarifications received
21 Jun 17 - Summary note being prepared
07 Jul 17 - Awaiting EB decision