Project: 1199 9.8 MW Biomass Based Power Plant at Lahari Power & Steels Limited in Champa-Janjgir District, Chattisgarh - Request for post-registration changes
Project 1199 9.8 MW Biomass Based Power Plant at Lahari Power & Steels Limited in Champa-Janjgir District, Chattisgarh
PRC ref PRC-1199-001
Process track Prior approval
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 03 Sep 07 - 02 Sep 17
Assessment opinion Assessment opinion (72 KB)
Revised PDD Revised PDD (720 KB)   Revised PDD - track changes (802 KB)
Supplementary documents Appendix 1 - Annex 1_LPSL_MOC_06-08-12.pdf (433 KB)
Signed form Signed form (163 KB)
DOE clarification
VVS version VVS 2.0
Current status 22 Oct 12 - Approved
Effective approval date: 22 Oct 12
Historic statuses 18 Sep 12 - Published
18 Sep 12 - Summary note being prepared
01 Oct 12 - Awaiting EB decision