Project: 0258 Nueva Aldea Biomass Power Plant Phase 1 - Request for post-registration changes
Project 0258 Nueva Aldea Biomass Power Plant Phase 1
PRC ref PRC-0258-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2012 - 31 Oct 2013

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Jan 12 - 31 Dec 18
Assessment opinion Assessment opinion (2113 KB)
Revised PDD Revised PDD (2700 KB)   Revised PDD - track changes (2660 KB)
Supplementary documents Appendix 1 - 1.4. 0258-CERS-11-12 ver1.zip (105 KB)
Signed form Signed form (50 KB)
DOE clarification
VVS version VVS 7.0
Current status 31 Aug 15 - Approved
Effective approval date: 31 Aug 15
Historic statuses 31 Jul 15 - Request published