Project: 5553 Renewable Wind Power generation for promoting energy security - Request for post-registration changes
Project 5553 Renewable Wind Power generation for promoting energy security
PRC ref PRC-5553-001
Process track Issuance
DOE LRQA
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list ACM0002 ver. 15 - Grid-connected electricity generation from renewable sources
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Apr 12 - 31 Mar 22
Assessment opinion Assessment opinion (373 KB)
Revised PDD Revised PDD (1235 KB)   Revised PDD - track changes (1311 KB)
Supplementary documents
Signed form Signed form (362 KB)
DOE clarification
VVS version VVS 2.0
Current status 19 Jun 15 - Approved
Effective approval date: 19 Jun 15
Historic statuses 21 May 15 - Request published