Project: 2850 Sichuan Muli River Dashawan Hydropower Station - Request for post-registration changes
Project 2850 Sichuan Muli River Dashawan Hydropower Station
PRC ref PRC-2850-001
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 19 Apr 10 - 18 Apr 17
Assessment opinion Assessment opinion (602 KB)
Revised PDD Revised PDD (1951 KB)   Revised PDD - track changes (2022 KB)
Supplementary documents
Signed form Signed form (302 KB)
DOE clarification
VVS version VVS 9.0
Current status 02 Feb 17 - Approved
Effective approval date: 02 Feb 17
Historic statuses 04 Jan 17 - Request published