13:23 19 Mar 24
New methodologies submitted
New methodologies submitted
The following proposals on new baseline and monitoring methodologies have been submitted to the CDM Executive Board for its review and are available for public input from 14 December 2007 - 02 January 2008: NM0244: TNUIFSL- Municipal Street Lighting and Water Pumping Efficiency Improvement Project NM0245: The 220 MW Egiin Gol Hydroelectric power generation project in Mongolia (The Project or Project activity) NM0246: Katende Hydroelectric Project NM0247: Manufacturing and servicing of refrigerators using low GWP refrigerant by M/s Videocon Appliances Ltd NM0248: Project for useful use of landfill gas actually being flared substituting natural gas NM0249: Reduction in Emissions in the Manufacture of Phospho-gypsum-based Gypcrete Wall Panel by Gypcrete Building India Ltd. NM0250: Fès Waste Water Treatment Plant (WWTP) with sludge treatment and biogas recovery & utilization for electricity generation at Fès city, Morocco NM0251: South Korea SF6 capture and recycling project NM0252: Replacement of SF6 with FK 5-1-12 as a cover gas in the magnesium industry NM0253: Destilmex fuel ethanol project The above submitted documentation is available under the following link: <https://cdm.unfccc.int/goto/MPpropmeth> |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: