New methodologies submitted / Other methodological issues

New methodologies submitted / Other methodological issues

(1) Methodologies

(a) The following proposals on new baseline and monitoring methodologies have been submitted to the CDM Executive Board for its review and are available for public input from 29 May - 18 June 2008:

NM0264: Caracol Knits Trigeneration Project
NM0265: Reduction of flaring of COG through conversion into dimethyl ether to be used as fuel in Shanxi, China
NM0266: Mumbai Metro One, India
NM0267: Shuixi Gou Coal Field Fire Extinguishing Project
NM0268: Titis Sampurna Semanggi Compressed Natural Gas Project
NM0269: Cambodia – Rural Electrification and Transmission Project (RETP) – 220 kV Interconnection between Cambodia and Vietnam
NM0270: Grid connected combined cycle power plant project in Qadirpur utilizing permeate gas, previously flared
NM0271: Point of Use Abatement Device to Reduce SF6 emissions in LCD Manufacturing Operations in the Republic of Korea (South Korea)
NM0272: Second Interconnection Colombia - Ecuador 230 kV
NM0273: Baseline and monitoring methodology for Coal-oxygen smelting reduction iron-making technology with lumping ore pre-reduction
NM0274: Installation of Natural gas based building combined cooling heating and power (CCHP) systems in commercial buildings of DLF in India
NM0275: Methodology for the production of a cement extender from slag and/or the increase in energy efficiency in the production of base metal alloys through the recovery of metal from the slag, as well as the increasing blend in cement
NM0276: Hot rolled steel coils transportation through ocean barges at ArcelorMittal Tubarão

The above submitted documentation is available under the following link: https://cdm.unfccc.int/goto/MPpropmeth

(b) The following proposed new methodologies were sent from the Meth Panel through the DOE to the project participants to invite clarifications to the preliminary recommendations and technical clarifications to the following proposed new methodologies were provided:

NM0244: TNUIFSL- Municipal Street Lighting and Water Pumping Efficiency Improvement Project
NM0251: South Korea SF6 capture and recycling project
NM0253: Destilmex fuel ethanol project

The above submitted documentation is available under the following link: http://cdm.unfccc.int/goto/MPpropmeth

(c) New requests for revision and new requests for clarification of approved methodologies and have been received. Further information on these submissions is available on the UNFCCC CDM web site at:
http://cdm.unfccc.int/methodologies/PAmethodologies/Revisions/index.html (for revisions) and at:
http://cdm.unfccc.int/methodologies/PAmethodologies/Clarifications/index.html (for clarifications).

(d) New requests for clarification of approved methodological tools have been received. Further information on these submissions is available on the UNFCCC CDM web site at:
http://cdm.unfccc.int/methodologies/PAmethodologies/ClarificationsTools/index.html

(2) Afforestation/Reforestation Methodologies

(a) One new request for revision of an approved A/R methodology has been received. Further information on this submission is available on the UNFCCC CDM web site at:
http://cdm.unfccc.int/methodologies/ARmethodologies/Revisions/index.html

(3) Small-Scale Methodologies

(a) New requests for clarifications/revision of approved SSC methodologies have been received. Further information on these submissions is available on the UNFCCC CDM web site at:
http://cdm.unfccc.int/methodologies/SSCmethodologies/Clarifications/index.html